The welcome sign is out early on this Anaheim home.
Framing is mostly done along with most of the electrical inside wiring.
A long look down the side of the property.
More interior completion work with some solid plywood sheeting in place.
T-shirt worn by the volunteers of Marriott Hotels.
Prepping and painting the hard to reach places is tough work. One of our volunteers takes on the task.
It's that part of construction where the windows and sliding doors are set in place and secured to the framing.
More detailed painting and priming the wood surfaces before being installed. This kind of preparation ensures a long lasting life of the wood.
It's time to protect the framed home by installing the roof. Everything that has taken place up to now needs a water tight roof. These guys are starting that process with a layer of tar paper prior to the roofing material.
Safety comes first for our workers. Even though it's a low sloping roof each person wears a yellow safety harness in case of a slip or fall.
Progress on the roof is moving quickly. This home is coming along nicely.